For Hong Kong’s Critical Infrastructure
Top One Power recently completed a series of demanding outdoor high-voltage load test projects, showcasing exceptional performance and reliability of our power solutions for Hong Kong’s critical infrastructure, including pioneering green energy initiatives. These tests highlight our commitment to delivering dependable power for Hong Kong’s vital energy sector.
In recent months, our team successfully executed two independent 4-hour, 11kV (high-voltage) load tests on two 2000kW biogas generators at the New Territories West Landfill Gas Power Project, also known as the WE Station. The WE Station is a pioneering renewable energy facility in Hong Kong that converts landfill gas into clean electricity. We supplied a rental 100kVA genset to power the high-voltage loader fan’s cooling system during the test, guaranteeing reliable test results.
We also performed a rigorous 4-hour, 11kV (high-voltage), load test on a 2000kW diesel generator at the Tseung Kwan O Desalination Plant. The desalination plant is a key component of Hong Kong’s water security and resilient water supply. The plant’s design incorporates energy efficiency measures, aligning with the city’s climate change mitigation goals. Once again, our supplementary 100kVA rental genset powered the high-voltage loader fan’s cooling during the test.
These projects showcase our expertise in providing high-voltage load testing services for high-power rating units and generators already installed at sites. We are proud to be both diesel generator supply and comprehensive load testing services, contributing to a more sustainable future for Hong Kong. Let us be your partner in building a sustainable energy future. Contact us today to discover how our reliable power solutions can support your green initiatives!
Top One Power provides comprehensive high-voltage load testing services for 2000kW generators, as evidenced by our successful projects at Hong Kong’s critical infrastructure.